| 路基边坡坡度检测记录表 | |||||||||||
| 施工单位:中铁十局中南通道(河南段) ZNTD-15 项目部一分部 | |||||||||||
| 监理单位:河南长城铁路工程建设咨询有限公司山西中南部铁路通道ZNJL-12标监理项目部 | |||||||||||
| 桩 号 | 左侧 | 右侧 | 备注 | ||||||||
| 高程 | 设计值(%) | 实测值(%) | 偏差值(%) | 高程 | 设计值(%) | 实测值(%) | 偏差值(%) | ||||
| 坡顶(m) | 坡脚(m) | 坡顶(m) | 坡脚(m) | ||||||||
| D1K95+625.00 | 56.29 | 50.39 | 150 | 145 | -5 | 56.29 | 50.39 | 150 | 153 | 3 | |
| D1K95+660.00 | 56.15 | 50.37 | 150 | 149 | -1 | 56.15 | 50.37 | 150 | 148 | -2 | |
| D1K95+700.60 | 55.99 | 50.59 | 150 | 147 | -3 | 55.99 | 50.59 | 150 | 152 | 2 | |
| D1K95+740.00 | 55.83 | 50.18 | 150 | 145 | -5 | 55.83 | 50.18 | 150 | 145 | -5 | |
| D1K95+780.00 | 55.67 | 49.92 | 150 | 146 | -4 | 55.67 | 49.92 | 150 | 146 | -4 | |
| D1K95+820.30 | 55.51 | 49.94 | 150 | 151 | 1 | 55.51 | 49.94 | 150 | 154 | 4 | |
| D1K95+840.00 | 55.43 | 49.95 | 150 | 148 | -2 | 55.43 | 49.95 | 150 | 153 | 3 | |
| D1K95+880.00 | 55.27 | 49.80 | 150 | 148 | -2 | 55.27 | 49.80 | 150 | 147 | -3 | |
| D1K95+920.00 | 55.11 | 49.58 | 150 | 147 | -3 | 55.11 | 49.58 | 150 | 148 | -2 | |
| D1K95+966.27 | 54.92 | 49.50 | 150 | 153 | 3 | 54.92 | 49.50 | 150 | 149 | -1 | |
| D1K95+967.26 | 54.92 | 49.79 | 150 | 146 | -4 | 54.92 | 49.79 | 150 | 146 | -4 | |
| D1K96+001.58 | 54.78 | 49.49 | 150 | 145 | -5 | 54.78 | 49.49 | 150 | 147 | -3 | |
| D1K96+039.70 | 54.63 | 50.21 | 150 | 154 | 4 | 54.63 | 50.21 | 150 | 145 | -5 | |
| D1K96+066.95 | 54.52 | 50.37 | 150 | 145 | -5 | 54.52 | 50.37 | 150 | 146 | -4 | |
| 测量: | 复核: | 监理工程师: | 日期: | ||||||||
| 路基边坡坡度检测记录表 | |||||||||||
| 施工单位:中铁十局中南通道(河南段) ZNTD-15 项目部一分部 | |||||||||||
| 监理单位:河南长城铁路工程建设咨询有限公司山西中南部铁路通道ZNJL-12标监理项目部 | |||||||||||
| 桩 号 | 左侧 | 右侧 | 备注 | ||||||||
| 高程 | 设计值(%) | 实测值(%) | 偏差值(%) | 高程 | 设计值(%) | 实测值(%) | 偏差值(%) | ||||
| 坡顶(m) | 坡脚(m) | 坡顶(m) | 坡脚(m) | ||||||||
| D1K96+105.00 | 54.52 | 50.23 | 150 | 149 | -1 | 54.52 | 50.23 | 150 | 147 | -3 | |
| D1K96+140.00 | 53.37 | 50.34 | 150 | 149 | -1 | 54.38 | 50.34 | 150 | 148 | -2 | |
| D1K96+180.00 | 53.23 | 50.28 | 150 | 152 | 2 | 54.24 | 50.28 | 150 | 147 | -3 | |
| D1K96+222.20 | 54.07 | 50.47 | 150 | 146 | -4 | 54.24 | 50.47 | 150 | 147 | -3 | |
| D1K96+256.19 | 53.99 | 49.23 | 150 | 145 | -5 | 54.08 | 49.23 | 150 | 148 | -2 | |
| D1K96+285.00 | 53.99 | 47.90 | 150 | 154 | 4 | 54.0 | 47.90 | 150 | 148 | -2 | |
| D1K96+320.00 | 53.99 | 49.98 | 150 | 147 | -3 | 54.0 | 49.98 | 150 | 151 | 1 | |
| D1K96+351.75 | 53.99 | 48.80 | 150 | 147 | -3 | 54.0 | 48.80 | 150 | 146 | -4 | |
| D1K96+3.30 | 53.99 | 49.31 | 150 | 148 | -2 | 54.0 | 49.31 | 150 | 146 | -4 | |
| D1K96+417.75 | 53.99 | 49.36 | 150 | 151 | 1 | 54.0 | 49.36 | 150 | 147 | -3 | |
| D1K96+460.00 | 53.99 | 50.23 | 150 | 148 | -2 | 54.0 | 50.23 | 150 | 152 | 2 | |
| D1K96+500.00 | 53.99 | 50.39 | 150 | 147 | -3 | 54.0 | 50.39 | 150 | 147 | -3 | |
| D1K96+540.00 | 53.99 | 50.02 | 150 | 155 | 5 | 54.0 | 50.02 | 150 | 153 | 3 | |
| D1K96+580.00 | 53.99 | 49.24 | 150 | 146 | -4 | 54.0 | 49.24 | 150 | 149 | -1 | |
| 测量: | 复核: | 监理工程师: | 日期: | ||||||||
| 路基边坡坡度检测记录表 | |||||||||||
| 施工单位:中铁十局中南通道(河南段) ZNTD-15 项目部一分部 | |||||||||||
| 监理单位:河南长城铁路工程建设咨询有限公司山西中南部铁路通道ZNJL-12标监理项目部 | |||||||||||
| 桩 号 | 左侧 | 右侧 | 备注 | ||||||||
| 高程 | 设计值(%) | 实测值(%) | 偏差值(%) | 高程 | 设计值(%) | 实测值(%) | 偏差值(%) | ||||
| 坡顶(m) | 坡脚(m) | 坡顶(m) | 坡脚(m) | ||||||||
| D1K96+620.00 | 53.99 | 48.29 | 150 | 148 | -2 | 53.99 | 48.29 | 150 | 155 | 5 | |
| D1K96+660.00 | 53.99 | 48.34 | 150 | 147 | -3 | 53.99 | 48.34 | 150 | 145 | -5 | |
| D1K96+700.00 | 53.99 | 48.16 | 150 | 154 | 4 | 53.99 | 48.16 | 150 | 146 | -4 | |
| D1K96+739.00 | 53.99 | 48.16 | 150 | 145 | -5 | 53.99 | 48.16 | 150 | 153 | 3 | |
| D1K96+779.45 | 53.99 | 48.49 | 150 | 145 | -5 | 53.99 | 48.49 | 150 | 146 | -4 | |
| D1K96+810.00 | 53.99 | 48.34 | 150 | 151 | 1 | 53.99 | 48.34 | 150 | 145 | -5 | |
| D1K96+850.00 | 53.99 | 48.29 | 150 | 147 | -3 | 53.99 | 48.29 | 150 | 152 | 2 | |
| D1K96+0.00 | 53.99 | 47.98 | 150 | 146 | -4 | 53.99 | 47.98 | 150 | 149 | -1 | |
| D1K96+930.00 | 53.99 | 48.05 | 150 | 153 | 3 | 53.99 | 48.05 | 150 | 147 | -3 | |
| 测量: | 复核: | 监理工程师: | 日期: | ||||||||