Contractor:CATIC Position:Box culvert/drains Name of Procedure: Concrete
| 主要工程数量Main quantity of Items to be inspected | |||||||||||||||||||||||
| Serial No. | Inspection Items for Appearance | Quality Requirement | Comments | ||||||||||||||||||||
| 1 | Clause 9.0.1 | 混凝土的原材料、配合比、强度均符合设计和规范要求. Raw material, mix design, strength of concrete meet design requirements and specification. | Meets requirements | ||||||||||||||||||||
| 2 | Clause 9.0.2 | 混凝土无蜂窝、露筋现象,如有硬伤、掉角等缺陷均应修补完好.No honeycomb and steel bar exposure on concrete; mechanical damage or dropped angle should be remedied accordingly. | |||||||||||||||||||||
| Serial No. | Items to be measured | Specified value or permitted deviatioin (mm) | Measured value or deviation 实 测 值 或 实 测 偏 差 值 | Numbers to be inspected | Qualified Numbers | Percentage of qualification(%) | |||||||||||||||||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | |||||||||
| 1 | Width of cross section | ±20 | +10 | -5 | +8 | +7 | -6 | 5 | 5 | 100 | |||||||||||||
| 2 | Highness of cross section | ±20 | -12 | -10 | +6 | +9 | -15 | 5 | 5 | 100 | |||||||||||||
| 3 | Top evevation | ±10 | +7 | -6 | -7 | -3 | +11 | 5 | 4 | 80 | |||||||||||||
| 4 | Position of axis | 15 | 12 | 8 | 10 | 8 | 6 | 5 | 5 | 100 | |||||||||||||
| 5 | Evenness | 5 | 3 | 4 | 2 | 3 | 4 | 5 | 5 | 100 | |||||||||||||
| 6 | |||||||||||||||||||||||
| 7 | |||||||||||||||||||||||
| 8 | |||||||||||||||||||||||
| Crew of handing over | Crew of taking over | Comments from consultant | Signature: | Average rate of qualification(%) | 96% | ||||||||||||||||||
| Grading | Excellent | ||||||||||||||||||||||