视频1 视频21 视频41 视频61 视频文章1 视频文章21 视频文章41 视频文章61 推荐1 推荐3 推荐5 推荐7 推荐9 推荐11 推荐13 推荐15 推荐17 推荐19 推荐21 推荐23 推荐25 推荐27 推荐29 推荐31 推荐33 推荐35 推荐37 推荐39 推荐41 推荐43 推荐45 推荐47 推荐49 关键词1 关键词101 关键词201 关键词301 关键词401 关键词501 关键词601 关键词701 关键词801 关键词901 关键词1001 关键词1101 关键词1201 关键词1301 关键词1401 关键词1501 关键词1601 关键词1701 关键词1801 关键词1901 视频扩展1 视频扩展6 视频扩展11 视频扩展16 文章1 文章201 文章401 文章601 文章801 文章1001 资讯1 资讯501 资讯1001 资讯1501 标签1 标签501 标签1001 关键词1 关键词501 关键词1001 关键词1501 专题2001
钻井100句
2025-10-02 12:39:30 责编:小OO
文档
[ I A D C  100 句 ]

钻 前 准 备

last anchor on rack at 0600HR  六点最后一个锚上架

start of contract at 1530HR    下午三点半合同开始

end of contract at 0530HR     五点半结束承包合同

rig on tow    平台拖航

rig arrived well location at 1000HR    10点平台到达井位

run anchors and first anchor on bottom at 1100HR  抛锚.11点第一个锚到底

ballast rig to 70’ draft 压载到70英尺

deballast rig  卸载

adjust well location with pull No.1 and No.2 anchors gain  拉一、二号锚调整并位

anchor tension test No.3 and No.4 OK  锚张力试验.三、四号锚合格

wait slack tide  等平潮

replace upper kelly cock  替换方钻杆上阀

钻 进

spud time  开钻时间

arrived time   到达并位时间 

drill 36” hole from 120m to 200m & pump 50BBLS mud each connection and ream each connection once  

从120米钻至200米每钻一根打50桶泥浆和扩眼一次

open 17 1/2” hole from 250m to 500m  用17 1/2”钻头扩眼

leak off test at 500m. MW 1.2sg leak off @ 625psi  

破裂实验并深500米比重1.2sg泄漏压力为625 psi

ream hole from 450m to 500m  从事50米扩眼到点500米

core drill from 1300m to 1320m  取芯钻进从1300米到1320米

collect/remove core and service core equipment  回收岩芯及服务工作

sweep hole with 100 bbl HI-VIS mud台 清洗并用100桶高粘度泥浆

slug the hole with viscous mud  往井中泵入一段稠泥浆

pump 6000 STKS HI-VIS mud  打6000冲高粘度泥浆

circulate and working on pipe  循环活动钻具

circulate and wash hole from 100m to 200m  在100-200米井段循环冲洗

circulate bottoms up  循环井底出来

circulate for sample   循环取样

flow check at 2300m due to drilling break  钻至2300米时突然加快观察

circulate for flow check  循环观察

circulate and condition mud  循环处理泥浆

reverse circulate  反循环

起 下 钻

POOH no rotary and no drag  起钻没用钻盘也没拖挂 

run in W/26” X 36” BHA tag seabed @ 117m  

组合36”扩眼及26”领眼钻头上钻探泥面在177米

RIH to wipe trip  下钻通井

RIH to tag top of cement at 1000m  下钻探水泥面在1000米

short trip 0/pull 50klbs  短程起下钻过提50千磅

make up new BHA  重新组合下部钻具

drop survey pump slug POOH  投测打重泥浆起钻

retrieve/return survey  回收测斜仪

inside BOP drill at casing shoe  防喷演习在套管鞋

POOH circ. & fill annulars W/TR.TK.P no good. Suspect mud problems. W/pull out other 5 stands & fill

a time OK  起钻灌泥浆情况不好,怀疑是泥浆问题,每起五柱灌一次正常

POOH due to change bit  起钻换钻头

POOH due to lost pump pressure suspect washout D.C  泵压下降起钻怀疑钻挺刺坏 

POOH due to plan change  计划改变起钻

POOH for changing bottom hole  起钻组合钻具

POOH wet pipe and no slug  起钻喷泥浆(没打重泥浆)

POOH no rotary  起钻不转转盘    

POOH and tight hole at 2500m max 0/pull 100klbs  起钻在2500米遇阻过提100磅

slip and cut off drill line 110’  滑移切割钻井大绳100英尺

RIH at casing shoe lubricate rig  下钻到套管鞋平台保养

POOH @ cas. shoe adjust break & wait hole stabilize  起钻到套管鞋等井内稳定同时调节刹带

pull back 5 stands 5”D.P in derrick  起回五柱钻杆立于井架

复 杂 情 况

attempt retreive 9 5/8” wire bushing but fail  试图回收9 5/8’抗磨补芯没成功

50 BBLS pit gain shut in well observe pressure 0-SIDPP 175psi SICP  

泥浆池增量为50桶,关井,钻杆压力为0,套管压力为175psi

kill well as NHWOC’s request  按西部公司压井程序压井

CIRC. and COND. mud CIRC. out gas show from returns max gas 1700 units

循环处理泥浆,最大气测值为1700个单位

D.P hang off on L.P.R. CIRC. through wide open choke while W.T up mud

钻杆悬挂在下闸板循环通过全开阻流阀同时加重泥浆

monitor well on trip tank 3 BBLS gain in 2HRS  倒向计量罐观察2小时增加3桶

circulate and inspect due to pressure lost 200 psi  循环检查因为泵压下降200psi

CIRC. through choke holding 600psi back press on annulars while WT up mud 

保持0psi套压循环通过阻流管同时加重泥浆

bleed off shut in pressure 20BBLS return still flowing 泄掉关井压力20桶回流后,井内仍有回流

stuck pipe at 3020m and work on pipe with 100kibs 0/pull fire jar max pull 500klbs free

钻具卡在3020米,上提下放活动钻具,上提100千磅震击器工作,最大过提500千磅卡

work overshot onto fish w/max 0/pull 50kib free & POOH   打捞落鱼过提50千磅活动起钻

observe well on trip tank well static  倒向计量罐井内稳定

jump ROV and work for guide problems  下放潜水器帮助处理导向绳问题

attempt to re-establish guideline No.4  试图重新装置四号导向绳

ballast rig and pull anchors stable into 36” hole  压船 和拉锚对36”井眼

下 套 管 及 固 井

rig up run 9 5/8” casing  做下9 5/8’套管准备工作

pick up 9 5/8” hanger and R/tool mack up and torque up lay out same  

拉起9 5/8”套管悬挂器和下入工具上扭矩甩下

pick up casing shoe joint and float M/U inspect ok RIH

拉起套管鞋,浮阀短节灌水检查没问题入井

run stinger string  下内管柱

run 9 5/8”casing fill mud for each 10 joints  下9 5/8”套管每10 根灌泥浆一次

P/U and M/U 9 5/8” casing head joint continue RIH W/5”D.P 

接9 5/8”套管头用5”钻杆送

Hanger off 9 5/8” casing  悬挂9 5/8”套管

M/U cement line to the unit and pressure test same 2000psi ok  

连接地面固井管线并且试压2000psi合格

pressure test casing 2000psi hold 10 mins ok套管试压2000PSI稳压十分钟合格

rig line to CMT unit & set CMT plug as per NHWOC programs  按西部公司程序打水泥塞

back off run tool POOH and break lay down same  倒开送入工具起出卸掉甩下

起下BOP及试压

rig up run/pull BOP  准备下/起防喷器

run TGB W/rig camera to seabed. land on seabed. inspect W/camera appeared all ok. Release R/tool  用水下电视协助下永久导向架,座在海底并检查合格后倒出送入工具

inspect and repair BOP  检查修理防喷器

S.C.R about choke line 100psi with 1.26M.W 30 SPM and No.1 pump

阻流管线的压力降是100psi,泵速为30冲/分,泥浆比重为1.26sg.用的一号泵 

BOP test as NHWOC’s request ok  按公司指令进行防喷器试压合格

pressure test inside BOP gray valve and kelly upper/lower valves ok

方钻杆上下阀, 钻杆内防喷器,浮阀试压合格

inspect and repair yellow/blue pod function test BOP ok  检查黄兰盒及防喷器功能试验合格

crew working on moon pool and spider deck  井队人员在园井甲板和活动门工作

pick up 3 joint risers and R/tool make up install L.M.R.P

拉起三根隔水管及送入工具并连接好插入总承

run stack and pressure test choke/kill lines each 3 jts riser  

下防喷器及隔水管每下三根试压一次

pick up slip joint rig up choke/kill goose necks install rucker ring  

下伸缩节组装鹅颈管和支承环

jump ROV to watch and check well head well  放潜水器去观察井口状况良好 

land stack, lock connector check with 30 klbs 0/pull ok  

座封和连接井口关连接器上提30千磅检查合格

scope out slip jt pick up diverter and install same rig down BOP R/tools

拉出伸缩节内筒座转喷器以及甩下所有送入工具

pull out diverter slip joint risers and BOP  起转喷器、伸缩节、隔水管及防喷器

台 风

rig evacuate for typhoon  下台撤离防台风

first chopper land on rig at 0800hr  八点第一班机到平台

crew come back from SAN YA by the NH205 boat at 1700HR下午五点人员从三亚乘南海205船回到平台下载本文