视频1 视频21 视频41 视频61 视频文章1 视频文章21 视频文章41 视频文章61 推荐1 推荐3 推荐5 推荐7 推荐9 推荐11 推荐13 推荐15 推荐17 推荐19 推荐21 推荐23 推荐25 推荐27 推荐29 推荐31 推荐33 推荐35 推荐37 推荐39 推荐41 推荐43 推荐45 推荐47 推荐49 关键词1 关键词101 关键词201 关键词301 关键词401 关键词501 关键词601 关键词701 关键词801 关键词901 关键词1001 关键词1101 关键词1201 关键词1301 关键词1401 关键词1501 关键词1601 关键词1701 关键词1801 关键词1901 视频扩展1 视频扩展6 视频扩展11 视频扩展16 文章1 文章201 文章401 文章601 文章801 文章1001 资讯1 资讯501 资讯1001 资讯1501 标签1 标签501 标签1001 关键词1 关键词501 关键词1001 关键词1501 专题2001
cmmi 的访谈问题
2025-10-02 19:22:41 责编:小OO
文档
1 EXPLORATORY QUESTIONS FOR CM FAR SESSION – TEAM 2    2

2 EQs for CM FAR Session- Team 1    4

3 EQs for CM FAR Session- Team 4    5

 1 EXPLORATORY QUESTIONS FOR CM FAR SESSION – TEAM 2

Session: CM FAR                            Date & Time:                    Duration:  

 

IDQUESTIONSKPA REFERENCELISTEN FORTIME
T2/CM1How do you plan your configuration management activities for your project?CM.CO.1 Planning done according to organization level manuals and guidelines for CM2
CM.AB.1Existence and role of SCCB
CM.AB.2Identification of Config Administrator
CM.AB.3CA allocated through PTOD, SCCB exists
CM.AC.1Project-level CM Plan
CM.AC.2Content of CM Plan
CM.AC.4Identification of Cis
CM.AC.6Baselining and Control of Cis
CM.AC.8Master List of Cis in spdb
How are you made aware of the status of CRs raised?(FU)CM.AC.9Feedback on CRs, CR status 
CM.AC.10Configuration Audit
T2/CM2How do you handle any change in your project?

Who authorizes any major/minor change in requirements, design or already delivered code? (follow-up)

CM.AB.1Role of SCCB1
CM.AC.5Use of CR form and tracking
CM.AC.6Baselining and Control of CIs
T2/CM3Who is responsible for any CM activities within your project? (follow-up)

Is their any Configuration Controller? (follow-up)

CM.AB.2Role of CA in project
How do you assign responsibilities to your SCM? (follow-up)CM.AB.3CA allocated through PTOD, SCCB exists
T2/CM4How do you ensure that your team is capable of performing the CM activities?CM.AB.4Training on CM  for Configuration Administrator1
Have they received any kind of training? (follow-up)CM.AB.5Orientation of others
Do you document your CM activities within your Project Plan? (follow-up)CM.AC.1Project level CM Plan
CM.AC.2Content of CM Plan
T2/CM5What is the accessibility of your code and project documents to your team and to other projects?

Where do you keep your baselined documents and code? (follow-up)

CM.AC.3SPDB

Version Control Tool

Access control

Archive access restricted

0.5
How do you identify your CIs and where do you define your CIs? (follow-up)CM.AC.4Identification of CIs through CM Plan
How do you handle any minor change in requirements or in baselined items? (follow-up)CM.AC.5Use of CR form and tracking
How do you baseline and control your CIs? (follow-up)CM.AC.6Baselining and Control procedure
T2/CM6How do you ensure consistency of different work products across the life cycle of the project.

PE.AC.10XREF table
T2/CM7How do you ensure that your team members are always using the right version of documents and code and not an obsolete one?CM.AC.7Delivery from Release directory only

Master List of CIs point to right location

0.5
How do you do status accounting of your CIs? (follow-up)CM.AC.8Master List of CIs
Is it available to others also? (follow-up)CM.AC.9Existence of Master List of CIs in SPDB
T2/CM8How do you measure the status of your CM activities?

Do you collect any metric data for CM activities? (follow-up)

CM.ME.1Effort spent on CM activities

CR turnaround time

CI turnaround time

1
T2/CM7Who reviews CM activities in your project?CM.VE.1Senior Management through ORM1
CM.VE.2Project Manager (periodic & even-driven)
CM.VE.3Configuration audit using CI Audit Checklist
CM.VE.4 Internal Audit, SQA Audit
Does the senior management or PM review the project specific CM activities? (follow-up)CM.VE.1Senior Management through ORM
CM.VE.2Project Manager (periodic & even-driven)
How are the effectiveness and correctness of the CM activities reviewed? (follow-up)CM.VE.4Configuration Audit, Internal Audit, SQA Audit
T2/CM8How are process improvement activities carried out in the organization ?PC.AC.6

PC.AC.8

PC.AC.4

PC.AC.7

Individual can raise CR to PI group

SEPG reviews, approves, rejects CR

Implements on pilot basis

Organisation wide PDIP exists

T2/CM9How are you made aware of new processes that have been implemented in the organization ?PC.AC.9

PC.AC.10

E-mail, BBS, 

MOM of SEPG

Awareness Session, Workshop

SPDB

Give some instances
2 EQs for CM FAR Session- Team 1

EQ #EQKPA.CF.KPListen ForTime
T1 / CM 1

(Team 1 FU)

How do you manage and track the changes in client requirements? RM.AC.3

PE.AC.2

PE.AC.3

PE.AC.7

PE.AC.10

PE.ME.2

∙Change control process 

∙Change of project plan, test plans, traceability matrix

∙Scope document

∙SCCB

2
T1/CM2How do you manage and control different documents and codes pertaining to your area?PP.AC.8∙CMP as part of PMP following CMM

∙Baselining

∙Master list of CI

∙Cross Reference Table of CI

∙Access Control

∙Usage of Version Control tool

∙Component Cross Reference Table 

2 mins.
T1/CM3How are you made aware of any changes towards project schedule or project organization? PT.AC.4∙New Release Mails

∙Discuss with team members about the changes in PMP, Schedule, PTOD in PM meeting

2 mins.
T1/CM4What steps do you follow to make changes in your CI ? ?IM.AC.2∙As per CM Plan (Part of PMP) as per CM Manual

∙Inform PM / CA to check out previous version  

∙Project CM administrator

∙Checking out of Archive by CA / PM

∙Make changes 

∙Reviews and approval

∙Master List of CIs

∙Component Cross Reference Table

1 min.
3 EQs for CM FAR Session- Team 4

EQ #EQKPA.CF.KPListen ForTime
T4/CM1WYPD how DP activities are planned and carried out at project level?

FU 

Can you share with us some examples where DP activities has resulted in improvement 

DP.AB.2

DP.CO.1

DP.CO.2

DP.AB.1

DP.AC.1

DP.AC.2

DP.AC.3

DP.AC.4

DP.AC.7

DP.VE.1

DP.VE.2

∙PM & Project DP Coordinator responsible for DP activities at project level

∙Overall DP coodinator

∙DP Council

∙DP meetings scheduled as part of QMP

∙As per Project DP Plan 

∙Organization wide DP Plan

∙Phase Kick Off meetings/ MR Kick off meeting

∙Project team meetings, scheduled as part of PMP, discuss DP activities & quantitative goals

∙Casual Analysis Meeting

∙Phase End   

∙Defect metrics analyzed based on 

∙Defect database

∙Previous data for the project

∙impact of defect

∙frequency of occurance of defect type and root cause

∙cost of implementing process improvement for DP

∙impact of not addressing it

∙Based on the analysis, as per DP Manual and Root Cause Analysis Guideline appropriate corrective/preventive actions are formulated

∙These are prioritized & timelines drawn

∙Responsibilities assigned

∙Implemented

∙Tracked

∙Action items are tracked by Project DP Rep

∙DP group evaluates the effectiveness of these corrective/preventive actions

∙Revisions to the project level processes are carried out as per Guidelines for Tailoring the project

∙Suggestions from DP Council received based on practices in other projects

∙DP activities are discussed in PMR/ DP Council meeting

∙DP activities at project level audited along with internal audits

2
T4/CM2What do you know about TCM activities in Co. 

FU

Were you part of any pilot initiatives or have you benefited for any of the TCM initiatives

FU

WYPD any instance of any TCM workproduct used in your project

TM.AB.1

TM.AC.6

TM.AC.3

IC.AC.5

∙TMG

∙Pilot 

∙QA tools

∙Issue organizer

∙Prototypes

∙Java adapter  (GTA uses it)

∙Chinese editor

∙PDA application

∙SVG (Scalar vector Graphic) 

∙Part of IGC

∙TCM Workshops and communication through Co. BBS

∙Case sheets  in SPDB

∙Productivity improved 

∙Workproduct reviewed before put to use

2 mins.