视频1 视频21 视频41 视频61 视频文章1 视频文章21 视频文章41 视频文章61 推荐1 推荐3 推荐5 推荐7 推荐9 推荐11 推荐13 推荐15 推荐17 推荐19 推荐21 推荐23 推荐25 推荐27 推荐29 推荐31 推荐33 推荐35 推荐37 推荐39 推荐41 推荐43 推荐45 推荐47 推荐49 关键词1 关键词101 关键词201 关键词301 关键词401 关键词501 关键词601 关键词701 关键词801 关键词901 关键词1001 关键词1101 关键词1201 关键词1301 关键词1401 关键词1501 关键词1601 关键词1701 关键词1801 关键词1901 视频扩展1 视频扩展6 视频扩展11 视频扩展16 文章1 文章201 文章401 文章601 文章801 文章1001 资讯1 资讯501 资讯1001 资讯1501 标签1 标签501 标签1001 关键词1 关键词501 关键词1001 关键词1501 专题2001
机械常用英文缩写
2025-10-03 14:41:41 责编:小OO
文档
Glossary of Terms

术语

Glossary of Terms术语

AAR: Appearance Approval Report 外观批准报告

A/D/V: Analysis/Development/Validation 分析/开发/验证

A/D/V–DV: ADV Design Validation  ADV设计验证

A/D/V P&R:  Analysis/Development/Validation Plan and Report.  This form is used to summarize the plan and results for validation testing.  Additional information can be found in the GP-11 procedure.

分析/开发/验证计划和报告

A/D/V–PV: ADV Product Validation  ADV产品验证

AIAG: Automotive Industries Action Group, an organization formed by General Motors, Ford and Daimler-Chrysler to develop common standards and expectations for automotive suppliers. 汽车工业行动集团

AP: Advance Purchasing  先期采购

APQP: Advanced Product Quality Planning  产品质量先期策划

APQP Project Plan: A one-page summary of the SGM APQP process that describes the tasks and the timeframe in which they occur.  APQP项目策划

AQC:  Attribute Quality Characteristic  属性质量特性

ASQE: Advanced Supplier Quality Engineer 先期供应商质量工程师

BIW: Body in White. Usually the bare metal shell of the body including doors and deck lid prior to paint and trim. 白车身

BOM:  Bill of Materials  材料清单

BOP:  Bill of Process  过程清单

Brownfield Site:  An expansion of an existing facility.  扩建场地

CMM:  Coordinate Measuring Machine  三坐标测试仪

Cpk: Capability Index for a stabile process  过程能力指数

CTC: Component Timing Chart (DRE document)  零部件时间表(DRE文件)

CTS: Component Technical Specifications  零部件技术规范

CVER: Concept Vehicle Engineering Release  概念车工程发布

DC: Design Complete  设计完成

Defect outflow detection:  A phrase used in the Supplier Quality Statement of Requirements that refers to in-process or subsequent inspection used to detect defects in parts.  缺陷检测

DFM/DFA: Design for Manufacturability / Design for Assembly  可制造性/可装配性设计

DFMEA: Design Failure Modes and Effects Analysis.  It is used to identify the potential failure modes of a part, associated with the design, and establish a priority system for design improvements. 设计失效模式和后果分析

DPV:  Defects per vehicle  每辆车缺陷数

DR: Documentation Required  DR特性

DRE:  Design Release Engineer  设计释放工程师

DV: Design Validation  设计验证

E&APSP: Engineering & Advance Purchasing Sourcing Process.  工程&先期采购定点程序

EP: E-Procurement  电子采购流程

Error Occurrence Prevention: A phrase used in the Supplier Quality Statement of Requirements that refers to poke yoke or error-proofing devices used to prevent errors in the manufacturing process from occurring. 防错

FTQ: First Time Quality  一次通过质量

GA: General Assembly 总装

GD&T: Geometric Dimensioning & Tolerancing  几何尺寸与公差

SGM: Shanghai General Motors  上海通用汽车

GMAP: General Motors Asian Pacific 通用汽车亚太

GME: General Motors Europe 通用汽车欧洲

GMNA: General Motors North American 通用汽车北美

GP: General Procedure 通用程序

GPDS: Global Product Description System  全球产品描述系统

GPS: Global Purchasing System   全球采购系统

GPSC: Global Purchasing & Supplier Chain  全球采购及供应链

GR&R: Gage Repeatability and Reproducibility  检具重复性及再现性

Greenfield Site: A new supplier facility that is built to support a program.

GVDP: Global Vehicle Development Process  全球整车开发流程

IPTV: Incidents per Thousand Vehicles  每千辆车故障

IVER: Integration Vehicle Engineering Release  集成车工程发布

KCC: Key Control Characteristics.  It is a process characteristic where variation can affect the final part and/or the performance of the part.  关键控制特性

KCDS: Key Characteristic Designation System  关键特性指示系统

Kick-Off Meeting: The first APQP supplier program review. 启动会议(第一次APQP供应商项目评审)

KPC: Key Product Characteristic.  It is a product characteristic for which reasonably anticipated variation could significantly affect safety, compliance to governmental regulations, or customer satisfaction. 关键产品特性 

LAAM: (General Motors) Latin American, Africa & Meddle East  (通用汽车)拉丁美洲、非洲及中东

LCR: Lean Capacity Rate.  It is the GM daily capacity requirement. 正常生产能力

MCR: Maximum Capacity Rate. It is the GM maximum capacity requirement.  最大生产能力

MOP: Make or Purchase  制造/采购

MPC: Material Production Control  物料生产控制

MPCE: Material Production Control Europe  欧洲物料生产控制

MRD: Material Required Date; date material must be delivered in order to allow a build event to begin.  物料需求日期

MSA: Measurement Systems Analysis  测量系统分析

MVBns: Manufacturing Validation Build non-saleable  非销售车制造验证

MVBs: Manufacturing Validation Build saleable  销售车制造验证

NBH: New Business Hold  停止新业务

N.O.D.: Notice of Decision  决议通知

OEM: Original Equipment Manufacturer  主机客户

PAD: Production Assembly Documents  生产装配文件

PC&L: Production Control & Logistics  生产控制&物流

PDT: Product Development Team  产品开发小组

PFMEA: Process Failure Modes and Effects Analysis.  It is used to identify potential failure modes associated with the manufacturing and assembly process. 过程失效模式和后果分析

PPAP: Production Part Approval Process  生产件批准程序

Ppk: Performance index for a stable process  过程能力指数

PPM: 1) Program Purchasing Manager, 2) Parts per Million (rejects and returns to suppliers)  1)项目经理 2)每百万件的产品缺陷数

PPV: Product & Process Validation  产品及过程验证

PQC: Product Quality Characteristic  产品质量特性

PR/R: Problem Reporting & Resolution  问题报告及解决

PSA: Potential Supplier Assessment, a subset of the Quality System Assessment (QSA) 潜在供应商评审

PV: Product Validation  产品验证

QSA: Quality System Assessment  质量体系评审

QSB: Quality Systems Basics 质量体系基础

QTC: Quoted Tool Capacity  工装报价能力

RASIC: Responsible, Approve, Support, Inform, Consult  负责、批准、支持、通知、讨论

R@R: Run at Rate 按节拍生产

RFQ: Request For Quotation  报价要求

RPN: Risk Priority Number related to FMEA development  风险顺序数

RPN Reduction Plan: An action plan that describes what is being done to reduce the risk priority number for items listed in the DFMEA or PFMEA.  降低RPN值计划

SDE: Supplier Development Engineer  供应商开发工程师

SFMEA:  System Failure Mode and Effects Analysis  系统失效模式分析

SMT: System Management Team  系统管理小组

SOA: Start of Acceleration  加速开始

SORP: Start of Regular Production  正式生产

SOR: Statement of Requirements  要求声明

SPC: Statistical Process Control   统计过程控制

SPO:  (General Motors) Service and Parts Operations  (通用汽车)零件与服务分部

SQ:  Supplier Quality  供应商质量

SQE: Supplier Quality Engineer  供应商质量工程师

SQIP: Supplier Quality Improvement Process  供应商质量改进过程

SSF: Start of System Fill  系统填充开始

SSTS: Sub-system Technical Specifications  子系统技术规范

Sub-Assembly / Sub-System: An assembly of sub-components delivered to the SGM main production line for installation to the vehicle as a single unit.   

Subcontractor: The supplier of a sub-component to a Complex System/Subassembly supplier (Tier 2, 3, etc). 分供方

SVE: Sub-System Validation Engineer  子系统验证工程师

SVER: Structure Vehicle Engineering Release. 结构车工程发布

Team Feasibility Commitment:  An AIAG APQP form that is provided with the Request for Quotation.  It is the supplier’s concerns with the feasibility of manufacturing the part as specified.  小组可行性承诺

TKO: Tooling Kick-Off  模具启动会议

UG: Unigraphics  UG工程绘图造型系统

VLE: Vehicle Line Executive  车辆平台负责人

VTC: Validation Testing Complete  验证试验完成

WO: Engineering Work Order  工程工作指令下载本文